Environmental engineering
Environmental compliance & approvals — EIA, EC, FC, CRZ, CGWA, CTE- CTO, Environment monitoring, Audits & Engineering Turnkey Projects WTP, STP, ETP, ZLD & APCD solutions.
150+ industrial clients across pharma, chemicals, mining, and infrastructure.


























































A complete environmental practice
From EIA clearance to commissioned compliance infrastructure — 0 integrated practice areas, one accountable team.
Environmental Clearance & Enviro-Legal Compliance
MoEFCC, SEIAA, and CPCB clearance support with end-to-end documentation, hearings, and post-EC compliance.
- End-to-end support for obtaining statutory environmental approvals and regulatory permissions from MoEF&CC, CPCB, SPCB/GPCB, CGWA, CRZ Authorities, Forest and Wildlife Authorities
- Environmental Clearance (EC), Coastal Regulation Zone (CRZ) Clearance, Forest Clearance, and Wildlife Clearance services.
- Consent Management including Consent to Establish (CTE), Consent to Operate (CTO/CC&A), and consent amendments from Pollution Control Boards.
Environmental Monitoring, Sampling & Laboratory Analysis Services
Systematic sampling, measurement, and laboratory evaluation of environmental parameters across air, water, soil, and workplace.
- Ambient, indoor, stack, and fugitive air monitoring
- Workplace, illumination, and noise level surveys
- Soil, sludge, hazardous waste, and leachate sampling
Wastewater Treatment Plants — Design & Build
Custom ETP, STP, and ZLD systems engineered for process fit, footprint, and lifecycle cost.
- Conventional, MBBR, MBR, SBR, and EOP technologies
- MEE, ATFD, and crystallizer-based ZLD
- Recycle and reuse systems with RO, UF, and ion-exchange
Explore all 0 services across 0 practice areas
EIA, monitoring, audit, EHS, mining, and full engineering build-outs — all under one roof.
View more services0+ Engineering-grade systems
for water, wastewater & air.
Every unit is designed in-house, manufactured to IS / ASME standards, and backed by Bharti Enviro's commissioning teams — from compact package plants to full-scale ZLD and FGD trains.
Where our work shows up.
Sector-specific playbooks built from years of fieldwork, refined across pharma, chemicals, mining, infrastructure, and beyond.
Mining, River Valley & Primary Processing
Power Plant & Cement Industries
Manufacturing Industries
From liability to legacy.
We take aging, non-compliant infrastructure and re-engineer it into modern, ISO-certified systems that regulators trust and communities benefit from.
Projects Delivered
Years of Experience
Industry Sectors
Built for industry, accountable to outcomes.
Six commitments that shape how we scope, staff, and deliver every mandate.
Defensible compliance
Documentation rigorous enough for MoEFCC, GPCB, IFC, and lender review. We build the trail before you need it.
Predictable timelines
Approvals sequenced in parallel where regulators permit. Time-to-commissioning shortens without shortcuts.
Engineering depth
EIA modelers, process engineers, IH specialists, and surveyors under one roof — not a brokered network.
Lifecycle cost first
Designs benchmarked on 10-year cost, not lowest capex. ZLD systems that recover ~99% over a decade.
Outcome-based O&M
We operate what we build. Long-term O&M with KPI-linked SLAs and guaranteed regulatory uptime.
Senior leadership on every mandate
A partner-grade lead is named at kickoff and stays accountable through close-out. No bait-and-switch staffing.
A four-stage delivery model
From the first screening call to the last compliance report — sequenced for clarity and accountability.
Scope & Screen
Free 30-minute screening call to map applicability, regulator pathways, and an indicative timeline.
Plan & Baseline
Engagement plan, ToR, and baseline data — air, water, soil, social — captured under accredited protocols.
Engineer & Approve
EIA, modelling, and engineering deliverables. Regulator submissions, public hearings, and approvals secured.
Build & Operate
Turnkey ETP, ZLD, APCD execution with optional multi-year O&M and continuous compliance reporting.
Training Programmes
Induction, safety, compliance, and audit-readiness training delivered on-site, virtually, or hybrid — scoped to your workforce and plant requirements.
EHS Induction / Safety Orientation
Factory rules, EHS policy, hazards, prohibited practices, emergency arrangements, reporting system
Factories Act / OSH Legal Requirements
Worker responsibilities, occupier duties, safety requirements, statutory compliance
General Workplace Safety
Unsafe acts/conditions, safe working practices, housekeeping, safety signs
0 training programmes on offer
Custom in-house programmes also available — send us a query with your requirements.
Regulatory & government portals
Quick access to the portals our team uses for clearances, consents & compliance.
MoEFCC
Ministry of Environment, Forest & Climate Change
CPCB
Central Pollution Control Board
PARIVESH
Single Window Clearance Portal
GPCB
Gujarat Pollution Control Board
CGWA
Central Ground Water Authority
PESO
Petroleum & Explosives Safety Org.
UN SDGs
UN Sustainable Development Goals
IPCC
Intergovernmental Panel on Climate Change
Swachh Bharat
Swachh Bharat Mission
The work speaks. So do the people we work for.
“Bharti Enviro carried our greenfield plant from screening through final EC without a single regulatory deferral. Their EIA depth and public-hearing preparation was a different league.”
Rajiv Patel
Director - Operations · Exotic Life Sciences
“The ZLD system they engineered for our pharma site has run within compliance for thirty consecutive months. The team behaves like part of our own operations.”
Anand Kothari
Plant Head · Bhagat Pharma
“Honest, technical, and accountable. Their EHS audit caught issues a previous big-name consultant had missed, and they helped us close every one of them.”
Meera Shah
EHS Manager · Kalintis Healthcare
“We engaged them for a complex CRZ project and they navigated the committee process with patience and precision. We will use them again.”
Sandeep Rao
Project Director · Pardesi Global Services
Frequently asked questions
Common regulatory and engineering questions we answer at the screening stage.
Projects listed in the Schedule of EIA Notification 2006, across mining, thermal power, infrastructure, manufacturing, building construction (≥20,000 m²), and chemical/pharma sectors, require prior Environmental Clearance from MoEFCC (Category A) or SEIAA (Category B). We assess applicability during a 30-minute screening call.
Start a project
A 30-minute screening call usually saves a year of avoidable rework.
Walk us through your project. We'll map regulator pathways, indicative timelines, and a costed engagement plan, at no charge.